Skip to main content

Guide · Procurement

The minimum ESG data set to request from an SME supplier

A practical baseline for round one — what to ask a small supplier for first, and what to leave out until it matters.

The short version
  • Procurement teams often ask SMEs for too much, too early. Round one should establish a useful baseline, not a complete disclosure.
  • The same core information should ideally be reusable across customers, not rebuilt for every questionnaire a supplier receives.
  • Twelve fields below cover a genuinely useful first round. Everything past that belongs in a later conversation.

Why round one should be small

A first ESG request to a small supplier is usually where the relationship either starts working or stalls. Ask for a seventy-column questionnaire from a supplier that has never calculated its emissions, and the likely outcome is a rushed, low-quality response — or no response at all. Ask for a short, answerable baseline, and you get something you can actually use, from a supplier that is more likely to keep it updated.

The goal of round one is not a complete disclosure. It is establishing the handful of facts that let you assess exposure and track progress — while leaving room for the supplier to answer more fully once they have the capability to do so.

The minimum data set

Data areaWhat to request
Company informationLegal name, sector, headcount, sites covered.
Reporting periodThe 12-month window the figures below refer to.
Electricity consumptionkWh purchased, by site or in aggregate.
Fuel / Scope 1 activityFuel types and volumes used on-site or in owned vehicles.
Scope 1 emissionsIf already calculated — do not require it if not.
Scope 2 emissionsIf already calculated — location- or market-based, whichever they have.
Waste informationBroad categories and approximate volumes, not a full waste audit.
Workforce informationHeadcount, and any diversity figures already tracked internally.
Health & safety indicatorOne metric — e.g. recordable incidents — not a full H&S programme review.
Environmental / sustainability policiesWhether they exist and are in force — yes/no, not the document itself.
Relevant certificationsISO 14001, B Corp, or sector-specific — whatever they actually hold.
Targets and supporting evidenceAny stated reduction targets, and what backs them up.

What not to ask in round one

This is usually the more useful half of the list. Don't begin with a seventy-column questionnaire if the supplier has never calculated its emissions:

Each of these is legitimate at a later stage, once the supplier has the baseline in place and the relationship has matured. Asking for them in round one mainly produces noise — guessed figures, blank fields, or a supplier who stops responding.

Making round one reusable

The same baseline a supplier gives you is the baseline every other customer is separately asking for. When a supplier answers once into a structured record instead of a fresh spreadsheet per buyer, the work compounds instead of repeating — and your team spends less time chasing the same fields from the same vendors, quarter after quarter. See how procurement teams send this to a whole supplier base and track who has responded.

Requesting this from an EU-based small supplier? The same twelve fields map onto the VSME value-chain cap — the proportionate scope EFRAG guidance points to for SME suppliers under CSRD.

Want suppliers to maintain these answers — not re-type them for every customer?

See how procurement teams collect and track this from their supplier base.